CONTACT US

+86-13664268735

sales@sertag.com

Home / All / PLT system /

What is the setup require, If the PTL electronic labels system is installed in a 500 square place?

What is the setup require, If the PTL electronic labels system is installed in a 500 square place?

Update Time:2025/2/24
Sertag base station and pick by light system (electronic shelf labels for warehousing) are serial communication, communication radius is about 20~30 meters; It is recommended that a router be bound with 200~300 PTL electronic labels, so that batch updates of multiple base stations can be faster.

One-stop Electronic Shelf Label Provider

Fast Quote
Worldwide Shipping
In-Time Service
Small Business Support
subscription
KEEP IN TOUCH (For job applications, please email your resume to sales@sertag.com. Submissions through this page will not be processed. Thank you.)
*Email
Name
Tel
*Title
*Content
Upload
  • Only supports .rar/.zip/.jpg/.png/.gif/.doc/.xls/.pdf, maximum 20MB.
CONTACT US
QR code
Mobile Web